You don't have javascript enabled. Good luck with that.
Pencarian
Pembangunan Embung Penganten Ali Capai 60 Persen

Ciracas District Head Inspects Construction of Penganten Ali Reservoir

Head of Ciracas District, Panangaran Ritonga reviewed the Penganten Ali reservoir on Jalan Penganten Ali, RW 06, Ciracas Urban Village, Ciracas District, East Jakarta. The work progress has reached around 60 percent and is targeted for completion on December 15, 2026.

Equipped with a jogging track

The reservoir, covering approximately one hectare, is built to help address flooding in the surrounding area and reduce the water level that previously flowed directly into the Cipinang River.

Pramono Inaugurates Two East Jakarta Retention Basins to Boost Flood Mitigation

Panangaran said the construction of the Penganten Ali Reservoir was a proposal from residents through the Development Planning Meeting (Musrenbang) in 2024. The land used is a social and public facility from PT Centek.

"The reservoir construction is carried out by the Jakarta Water Resources (SDA) Agency through the implementer who won the auction through the electronic catalog at the service," he said, Tuesday (10/27).

In addition to storing water, this reservoir is designed to control the water flow from the residential areas of RW 06, Ciracas Urban Village and the LRT apartment area before it is channeled into the Cipinang River.

He hopes that the Penganten Ali Reservoir will not only function as a flood control facility, but also become a public space and recreational destination for the community.

"This reservoir is also equipped with a jogging track and other facilities. We hope residents will use and maintain these facilities properly," he hoped.

Meanwhile, project implementer Misran explained that physical work began in August 2026. Currently, his side is focusing on building a 300-meter jogging track with a width of two meters.

"The reservoir is built to a depth of 4.5 meters to maximize its role as a flood control system," he explained.

Meanwhile, one of the local residents, Wahyudin (45) admitted the Penganten Ali Reservoir construction will provide benefits to the community, especially in efforts to overcome flooding.

"We hope the work is completed quickly and residents can feel the benefits. Furthermore, there's a jogging track so residents can exercise here," he admitted.

Linked News
Popular News indeks
  1. Jakarta Removes Gibran’s Portraits Across All Government Offices

    access_time16-11-2026 remove_red_eye967 personFakhrizal Fakhri
  2. Transjakarta Offers Free Rides for Jakarta Vertical Run 2026 Participants

    access_time14-11-2026 remove_red_eye636 personAldi Geri Lumban Tobing
  3. Governor Approves Removal of Seven Unauthorized Houses on Dispora Land

    access_time13-11-2026 remove_red_eye611 personFakhrizal Fakhri
  4. Pramono Outlines Measures to Address Five Issues in Kramat Jati

    access_time13-11-2026 remove_red_eye599 personFakhrizal Fakhri
  5. Jakarta Esports 2026 Draws Enthusiastic Crowds at M Bloc Space

    access_time13-11-2026 remove_red_eye566 personTiyo Surya Sakti